Candidate sites for an AI data center
The 40 parcels in Neuquén and Río Negro that score best for a data center: 50 ha or more, within 15 km of a 132 kV or higher substation and of a trunk gas pipeline.
The score is the one in the report with the Data center purpose: power, gas, fiber, water, climate, land and permits, each factor with its source.
Loading the list…
Estimated MW: hectares × 0.5, a rough density rule for a data center campus, up to 500 MW, estimated from land area; actual power is set by the grid (EPEN or the transmission company). Straight-line distances from the parcel boundary.
If a parcel interests you, we support you through the deal.