Planned works

Argentina LNG and VMOS pipeline routes, and the other works crossing Neuquén and Río Negro.

Where will the Argentina LNG and VMOS pipelines run? This page maps roads and bridges, pipelines, power, plants and ports, industrial parks, irrigation, water and sewage, health, housing, rail and fiber optics: everything officially announced, under study, funded, tendered or under construction. That is 16 works and about 3,001 km of routes between the Andes and the Atlantic. Each one with its status, operator and source document. Among them, the VMOS (Vaca Muerta Oil Sur) oil pipeline from Allen to Punta Colorada and the Argentina LNG gas pipeline, which runs largely along the same strip.

A route across a field brings a right of way; one nearby brings logistics and demand for services. Both change land value. What the map shows a landowner is in the frequently asked questions, and where to set up near a route, in land for companies.

See the future on the map Registered users only · sign up free
AñeloAtlánticoPowered by Esri
  • roads, bridges and accesses 22
  • oil and products pipelines 5
  • gas pipelines 5
  • power generation and lines 10
  • plants, ports and LNG 8
  • industrial parks and free zones 9
  • irrigation 7
  • water, sewage, health and housing 14
  • rail, airports and fiber optics 5
85 works · updated October 8, 2026 · Sketch with simplified lines. A hollow dot is a reference location (the town, not the work). Each work's geometry, with its accuracy, is on the map.

Planned roads, bridges and accesses 5

  • funded

    Ruta Provincial 8: pavimentación del empalme con la RP 6 al Camino de la Tortuga

    Del empalme con la RP 6 al Camino de la Tortuga, entre Añelo y Rincón de los Sauces

    The first work of the roads agreement between Neuquén and the Vaca Muerta operators: a direct paved route from Neuquén city to Rincón de los Sauces.

    Operator
    Provincia del Neuquén (Vialidad Provincial)
    Investment
    USD 91.3 M
    Length
    95 km

    Source: Vialidad Provincial de Neuquén, gacetilla del acuerdo (réplica de Neuquén Al Instante) (2026-09-08)

  • under construction

    Ruta Provincial 6: repavimentación en la zona de Rincón de los Sauces

    Entre los empalmes con la RP 5 y la RP 8

    Operator
    Provincia del Neuquén (Vialidad Provincial)
    Drawn length
    54 km

    Source: Vialidad Provincial de Neuquén, gacetilla del acuerdo (réplica de Neuquén Al Instante) (2026-09-08)

  • funded

    Ruta Provincial 8: repavimentación entre la RP 51 y la RP 7

    Entre los empalmes con la RP 51 y la RP 7, con una intersección nueva en el cruce de la RP 7 y la RP 8

    Operator
    Provincia del Neuquén (Vialidad Provincial)
    Investment
    USD 6.8 M
    Length
    8 km

    Source: Vialidad Provincial de Neuquén, gacetilla del acuerdo (réplica de Neuquén Al Instante) (2026-09-08)

  • funded

    Ruta Provincial 51: pavimentación y repavimentación entre la RP 8 y la RP 17

    Entre los empalmes con la RP 8 y la RP 17, por Mari Menuco

    Operator
    Provincia del Neuquén (Vialidad Provincial)
    Investment
    USD 50.4 M
    Length
    40 km

    Source: Vialidad Provincial de Neuquén, gacetilla del acuerdo (réplica de Neuquén Al Instante) (2026-09-08)

  • funded

    Ruta Provincial 7: repavimentación del límite con Río Negro a la RP 8

    Del límite con Río Negro al empalme con la RP 8

    Operator
    Provincia del Neuquén (Vialidad Provincial)
    Investment
    USD 6 M
    Length
    15 km

    Source: Vialidad Provincial de Neuquén, gacetilla del acuerdo (réplica de Neuquén Al Instante) (2026-09-08)

Planned oil pipelines 4

  • under construction · 77 %

    Oleoducto Vaca Muerta Sur (VMOS): Allen–Punta Colorada

    Allen (Río Negro) → terminal de Punta Colorada, cerca de Sierra Grande

    Operator
    VMOS S.A. (YPF y socias)
    Length
    437 km
    Expected end
    mediados de 2027 (390.000 bbl/d)

    Source: Secretaría de Energía, WFS oleoductos proyectados (2026-09-26)

  • under study

    Argentina LNG: poliducto de condensado 24" (tramo Río Negro)

    Mismo corredor que el gasoducto dedicado: cruce del Limay → Sierra Grande

    Operator
    YPF 36 % · ENI 32 % · XRG 32 %
    Length
    525 km

    Source: EIA Poliducto, Río Negro, Expte 071531-SEYA-2026 (2026-10-01)

  • under study

    Oleoducto proyectado Añelo–Allen

    Zona de Añelo (Neuquén) → Allen, donde empalma con el VMOS

    Drawn length
    126 km

    Source: Secretaría de Energía, WFS oleoductos proyectados (2026-09-26)

  • under study

    Oleoducto proyectado Allen–Bahía Blanca

    Allen → por el paralelo 39 (Chelforó, Río Colorado, Médanos) → cercanías de Bahía Blanca

    Drawn length
    457 km

    Source: Secretaría de Energía, WFS oleoductos proyectados (2026-09-26)

Planned gas pipelines 2

  • under study

    Argentina LNG: gasoducto dedicado 48" (tramo Río Negro)

    Cruce del Limay en el límite con Neuquén (PK 81,7) → al sur de la RN 22 → paralelo al VMOS 222 km → receptora en Sierra Grande (PK 525,7)

    Operator
    YPF 36 % · ENI 32 % · XRG 32 % (VPU MIDCO)
    Investment
    USD 1,200 M
    Length
    444 km
    Expected end
    octubre 2029 (puesta en marcha estimada)

    Source: EIA Gasoducto dedicado, Río Negro, Expte 071281-SEYA-2026: cap. 2 tabla 1 y Anexo II (2026-10-01)

  • under study

    Argentina LNG: arranque del gasoducto 48" (PK 0, planta CIN)

    Tramo neuquino, 82 km: sale al este, cruza la RP 17 en el PK 2,9 y baja paralelo a ella; 14 km antes de Cutral Có gira al sudeste, sigue paralelo a la RN 22 por la margen norte (a 0,5–1,5 km), pasa al norte de Challacó y cruza la RN 22 y el Limay

    Operator
    YPF 36 % · ENI 32 % · XRG 32 % (VPU MIDCO)
    Length
    82 km

    Source: EIA Gasoducto dedicado, Río Negro, Expte 071281-SEYA-2026: cap. 2 tabla 1 (2026-10-01)

Planned power generation and lines 2

Planned plants, ports and LNG 2

  • under study

    Argentina LNG: Complejo Industrial Neuquén (CIN/IGTP), 525 ha

    Meseta Buena Esperanza, 45 km al norte de Cutral Có; acceso de 2,3 km desde la RP 17

    Operator
    YPF (VPU UPCO)
    Investment
    USD 7,000 M
    Area
    525 ha

    Source: EIA Gasoducto dedicado (Río Negro), tabla 1, para la ubicación; Ámbito para el complejo (2026-10-01)

  • under study

    Argentina LNG: receptora y Complejo Industrial Río Negro (Sierra Grande)

    Fin del gasoducto (PK 525,7), cerca de Sierra Grande; 2 FLNG a 4–5 km de la costa del golfo San Matías

    Operator
    YPF · ENI · XRG (MIDCO)
    Investment
    USD 8,000 M

    Source: EIA Complejo Industrial RN, Expte 071661-SEYA-2026; ubicación del EIA del gasoducto (2026-10-01)

Rail, airports and fiber optics 1

Land near the works

Añelo · Rincón de los Sauces · San Patricio del Chañar · Catriel · Cutral Có · Plaza Huincul · Senillosa · Neuquén · Cipolletti · Allen · General Roca · Villa Regina · Choele Choel · San Antonio Este · Sierra Grande · Viedma · Operators

Rankings: Planned works by route length · Planned works by declared investment · Corridor towns by nearby planned works · all

Does any run near your land?