Planned works
Argentina LNG and VMOS pipeline routes, and the other works crossing Neuquén and Río Negro.
Where will the Argentina LNG and VMOS pipelines run? This page maps roads and bridges, pipelines, power, plants and ports, industrial parks, irrigation, water and sewage, health, housing, rail and fiber optics: everything officially announced, under study, funded, tendered or under construction. That is 16 works and about 3,001 km of routes between the Andes and the Atlantic. Each one with its status, operator and source document. Among them, the VMOS (Vaca Muerta Oil Sur) oil pipeline from Allen to Punta Colorada and the Argentina LNG gas pipeline, which runs largely along the same strip.
A route across a field brings a right of way; one nearby brings logistics and demand for services. Both change land value. What the map shows a landowner is in the frequently asked questions, and where to set up near a route, in land for companies.
- roads, bridges and accesses 22
- oil and products pipelines 5
- gas pipelines 5
- power generation and lines 10
- plants, ports and LNG 8
- industrial parks and free zones 9
- irrigation 7
- water, sewage, health and housing 14
- rail, airports and fiber optics 5
Planned roads, bridges and accesses 5
-
funded
Ruta Provincial 8: pavimentación del empalme con la RP 6 al Camino de la Tortuga
Del empalme con la RP 6 al Camino de la Tortuga, entre Añelo y Rincón de los Sauces
The first work of the roads agreement between Neuquén and the Vaca Muerta operators: a direct paved route from Neuquén city to Rincón de los Sauces.
- Operator
- Provincia del Neuquén (Vialidad Provincial)
- Investment
- USD 91.3 M
- Length
- 95 km
Source: Vialidad Provincial de Neuquén, gacetilla del acuerdo (réplica de Neuquén Al Instante) (2026-09-08)
-
under construction
Ruta Provincial 6: repavimentación en la zona de Rincón de los Sauces
Entre los empalmes con la RP 5 y la RP 8
- Operator
- Provincia del Neuquén (Vialidad Provincial)
- Drawn length
- 54 km
Source: Vialidad Provincial de Neuquén, gacetilla del acuerdo (réplica de Neuquén Al Instante) (2026-09-08)
-
funded
Ruta Provincial 8: repavimentación entre la RP 51 y la RP 7
Entre los empalmes con la RP 51 y la RP 7, con una intersección nueva en el cruce de la RP 7 y la RP 8
- Operator
- Provincia del Neuquén (Vialidad Provincial)
- Investment
- USD 6.8 M
- Length
- 8 km
Source: Vialidad Provincial de Neuquén, gacetilla del acuerdo (réplica de Neuquén Al Instante) (2026-09-08)
-
funded
Ruta Provincial 51: pavimentación y repavimentación entre la RP 8 y la RP 17
Entre los empalmes con la RP 8 y la RP 17, por Mari Menuco
- Operator
- Provincia del Neuquén (Vialidad Provincial)
- Investment
- USD 50.4 M
- Length
- 40 km
Source: Vialidad Provincial de Neuquén, gacetilla del acuerdo (réplica de Neuquén Al Instante) (2026-09-08)
-
funded
Ruta Provincial 7: repavimentación del límite con Río Negro a la RP 8
Del límite con Río Negro al empalme con la RP 8
- Operator
- Provincia del Neuquén (Vialidad Provincial)
- Investment
- USD 6 M
- Length
- 15 km
Source: Vialidad Provincial de Neuquén, gacetilla del acuerdo (réplica de Neuquén Al Instante) (2026-09-08)
Planned oil pipelines 4
-
under construction · 77 %
Oleoducto Vaca Muerta Sur (VMOS): Allen–Punta Colorada
Allen (Río Negro) → terminal de Punta Colorada, cerca de Sierra Grande
- Operator
- VMOS S.A. (YPF y socias)
- Length
- 437 km
- Expected end
- mediados de 2027 (390.000 bbl/d)
Source: Secretaría de Energía, WFS oleoductos proyectados (2026-09-26)
-
under study
Argentina LNG: poliducto de condensado 24" (tramo Río Negro)
Mismo corredor que el gasoducto dedicado: cruce del Limay → Sierra Grande
- Operator
- YPF 36 % · ENI 32 % · XRG 32 %
- Length
- 525 km
Source: EIA Poliducto, Río Negro, Expte 071531-SEYA-2026 (2026-10-01)
-
under study
Oleoducto proyectado Añelo–Allen
Zona de Añelo (Neuquén) → Allen, donde empalma con el VMOS
- Drawn length
- 126 km
Source: Secretaría de Energía, WFS oleoductos proyectados (2026-09-26)
-
under study
Oleoducto proyectado Allen–Bahía Blanca
Allen → por el paralelo 39 (Chelforó, Río Colorado, Médanos) → cercanías de Bahía Blanca
- Drawn length
- 457 km
Source: Secretaría de Energía, WFS oleoductos proyectados (2026-09-26)
Planned gas pipelines 2
-
under study
Argentina LNG: gasoducto dedicado 48" (tramo Río Negro)
Cruce del Limay en el límite con Neuquén (PK 81,7) → al sur de la RN 22 → paralelo al VMOS 222 km → receptora en Sierra Grande (PK 525,7)
- Operator
- YPF 36 % · ENI 32 % · XRG 32 % (VPU MIDCO)
- Investment
- USD 1,200 M
- Length
- 444 km
- Expected end
- octubre 2029 (puesta en marcha estimada)
Source: EIA Gasoducto dedicado, Río Negro, Expte 071281-SEYA-2026: cap. 2 tabla 1 y Anexo II (2026-10-01)
-
under study
Argentina LNG: arranque del gasoducto 48" (PK 0, planta CIN)
Tramo neuquino, 82 km: sale al este, cruza la RP 17 en el PK 2,9 y baja paralelo a ella; 14 km antes de Cutral Có gira al sudeste, sigue paralelo a la RN 22 por la margen norte (a 0,5–1,5 km), pasa al norte de Challacó y cruza la RN 22 y el Limay
- Operator
- YPF 36 % · ENI 32 % · XRG 32 % (VPU MIDCO)
- Length
- 82 km
Source: EIA Gasoducto dedicado, Río Negro, Expte 071281-SEYA-2026: cap. 2 tabla 1 (2026-10-01)
Planned power generation and lines 2
-
under study
LEAT 500 kV Corredor Sur: Choele Choel–Puerto Madryn
ET Choele Choel → ET Puerto Madryn, en paralelo a la 500 kV existente
- Length
- 354 km
Source: EIAS Corredor Sur (jul-2026), figs. 61 y 77; línea guía del WFS de Energía (2026-07)
-
under study
LEAT 500 kV Corredor Sur: Choele Choel–Bahía Blanca
ET Choele Choel → ET Bahía Blanca, en paralelo a la 500 kV existente
- Length
- 365 km
Source: EIAS Corredor Sur (jul-2026), fig. 85; línea guía del WFS de Energía (2026-07)
Planned plants, ports and LNG 2
-
under study
Argentina LNG: Complejo Industrial Neuquén (CIN/IGTP), 525 ha
Meseta Buena Esperanza, 45 km al norte de Cutral Có; acceso de 2,3 km desde la RP 17
- Operator
- YPF (VPU UPCO)
- Investment
- USD 7,000 M
- Area
- 525 ha
Source: EIA Gasoducto dedicado (Río Negro), tabla 1, para la ubicación; Ámbito para el complejo (2026-10-01)
-
under study
Argentina LNG: receptora y Complejo Industrial Río Negro (Sierra Grande)
Fin del gasoducto (PK 525,7), cerca de Sierra Grande; 2 FLNG a 4–5 km de la costa del golfo San Matías
- Operator
- YPF · ENI · XRG (MIDCO)
- Investment
- USD 8,000 M
Source: EIA Complejo Industrial RN, Expte 071661-SEYA-2026; ubicación del EIA del gasoducto (2026-10-01)
Rail, airports and fiber optics 1
-
announced
Aeropuerto Presidente Perón (Neuquén): nueva concesión y ampliación
- Province
- Neuquén
- Operator
- Provincia de Neuquén
Source: LM Neuquén, press (2026-04-07)
Land near the works
Añelo · Rincón de los Sauces · San Patricio del Chañar · Catriel · Cutral Có · Plaza Huincul · Senillosa · Neuquén · Cipolletti · Allen · General Roca · Villa Regina · Choele Choel · San Antonio Este · Sierra Grande · Viedma · Operators